Commercial Planning Resource Center

Plan commercial holiday projects with practical tools and checklists.

Use these resources to define the project, document site requirements, coordinate responsibilities, review schedules, and prepare the information needed before products are ordered or crews arrive.

For property managers, municipalities, hotels, resorts, shopping centers, commercial decorators, facilities teams, procurement teams, and professional installers.

Resource, collection, and contact links open in a new tab. Topic links move to sections on this page.

Choose the Resource That Matches Your Project Stage

Start with the tool that matches what your team needs to define, schedule, or verify next.

Use the Resources in This Order

A simple sequence keeps planning, site verification, and procurement from being mixed together.

Define the Project

Use the Project Brief to establish scope, budget range, display areas, opening date, approvals, responsibilities, and unresolved decisions.

Build the Schedule

Use the Planning Guide to coordinate product selection, ordering, freight, installation, testing, launch, and removal.

Verify the Site

Use the Lighting Checklist to confirm measurements, power, mounting, access, compatibility, approvals, and inventory.

Move to Procurement

Once the project and site information are documented, use Buying & Procurement Resources to prepare the purchase.

Explore Buying & Procurement Resources

Build the Schedule Around the Actual Project

Do not use one fixed planning window for every commercial holiday project. Work backward from the required opening date using the products, quantities, customization, approvals, freight requirements, receiving conditions, and installation scope for the actual project.

Work backward

Planning Sequence

Public opening or activation date → final testing → installation completion → installation start → product staging → receiving and inspection → freight → order release → product and site approval → site review → project brief approval.

Lead-time reference

Commercial Christmas Lighting Lead Times

Review the product, production, freight, customization, site-readiness, and seasonal factors that can affect purchasing and delivery schedules.

Review Lighting Lead Times

Assign Responsibilities Before Ordering

Commercial holiday projects often involve several parties. Record who owns each task before the order is released.

  • ApprovalsAssign design, budget, property, electrical, structural, and municipal or public-space approvals where applicable.
  • ReceivingAssign the receiving contact, delivery location, unloading, inspection, damage reporting, and staging responsibilities.
  • InstallationDocument responsibility for site preparation, lifts, electrical connection, mounting, anchoring, installation, and testing.
  • Operation & maintenanceAssign routine inspection, fault reporting, replacement parts, controller operation, and shutdown decisions where applicable.
  • RemovalAssign the takedown date, removal crew, packing, transportation, and inventory reconciliation.
  • Project ownershipName the person responsible for keeping approvals, schedules, site information, purchasing, and installation status coordinated.

Plan Receiving, Staging & Storage

Planning should include what happens after products arrive and what happens after seasonal removal.

Receiving

Confirm Delivery Conditions

Confirm the ship-to address, receiving hours, dock or unloading access, receiving contact, inspection process, and staging area.

Staging

Prepare the Installation Handoff

Plan where products will be counted, inspected, sorted by zone, labeled, and transferred to installation crews.

Post-season storage

Assign Storage Responsibility

Plan where products will be stored between seasonal deployments. Storage should be arranged by the property team or another provider and should not be assumed to be included with product supply or installation.

Recordkeeping: keep SKU records, zone assignments, setup photos, controller settings, replacement-part records, and inspection notes with the project documentation.

Inspect Existing Décor Before Calculating New Quantities

If the property already owns seasonal décor or lighting, inspect it before treating it as available inventory.

  • Damaged wiringIdentify damaged cords, plugs, sockets, or other electrical components before reuse.
  • Missing componentsCheck for missing hardware, bases, controllers, transformers, toppers, ornaments, or other required parts.
  • Failed sectionsTest existing lighting and displays rather than assuming stored inventory is operational.
  • Color mismatchRecord differences in lamp color, ornament color, finish, greenery, or other visible components.
  • CompatibilityConfirm existing controllers, power supplies, sockets, connectors, and replacement parts remain compatible.
  • Inventory statusClassify each item as Reuse, Replace, Repair, or Additional Quantity Needed.

Use Clear Approval Points

Use simple approval checkpoints so product ordering, installation, and public opening are treated as separate decisions.

Checkpoint 1

Before Design Approval

Confirm the project goal, included areas, budget range, and required opening date.

Checkpoint 2

Before Ordering

Confirm site fit, dimensions, product details, current lead times, approvals, responsibilities, and receiving conditions.

Checkpoint 3

Before Opening

Confirm installation and testing are complete, unresolved issues have been addressed, and operating responsibilities are assigned.

Move From Planning Into Product Selection

Once the scope, site requirements, responsibilities, and schedule are documented, move into the relevant product category.

Prepare Your Commercial Project Requirements

Share your property type, display areas, site photos, budget range, target opening date, existing décor, required arrival date, and decisions still under review. The St. Nick’s Sales Team can help with product options, current availability, lead-time questions, freight considerations, and product-specific requirements.

Speak with a Commercial Specialist